Network Maintenance - NYC Metro

  • Friday, 22nd April, 2016
  • 14:28pm
Time Frame
Start Time: 04-23-2016 7:00 AM
End Time: 04-23-2016 12:00 PM

We received this message from our NYC provider:

ColoCrossing will be performing significant upgrades to its core network infrastructure in NYC. We will be installing Juniper routers.

During this maintenance window, ColoCrossings NYC Network is likely to have a service interruption lasting between 45 minutes and 1 hour while we swap out equipment and make new connections. Our engineers will be on site during this maintenance performing it to ensure it goes as smooth as possible. Significant preparations will be made to limit downtime to as little as possible and we apologize for any inconvenience this may cause your operations.
« Back